AR, Asep Lusmana (2011) Evaluasi Dampak Hubungan Beban Kerja Dan Kapasitas Kerja Terhadap Produktivitas Kerja Karyawan Universitas Komputer Indoneisa (UNIKOM) Bandung. Other thesis, Universitas Komputer Indonesia.
UNIKOM_ASEP LUSMANA AR_COVER.pdf
Download (30kB)
UNIKOM_ASEP LUSMANA AR_ABSTRAK.pdf
Download (11kB) | Preview
UNIKOM_ASEP LUSMANA AR_ABSTACT.pdf
Download (9kB)
UNIKOM_ASEP LUSMANA AR_BAB I.pdf
Download (241kB)
UNIKOM_ASEP LUSMANA AR_BAB II.pdf
Download (77kB)
UNIKOM_ASEP LUSMANA AR_BAB III.pdf
Download (903kB)
UNIKOM_ASEP LUSMANA AR_BAB IV.pdf
Download (290kB)
UNIKOM_ASEP LUSMANA AR_BAB V.pdf
Download (17kB)
UNIKOM_ASEP LUSMANA AR_DAFTAR PUSTAKA.pdf
Download (11kB)
UNIKOM_ASEP LUSMANA AR_KATA PENGANTAR.docx
Download (26kB)
Abstract
Beban kerja dan kapasitas kerja adalah permasalahan yang tidak bisabr /
dipandang sebelah mata, karena efeknya akan berpengaruh besar tehadapbr /
produktivitas kerja karyawan itu sendiri. Ada kecenderungan beban kerja yangbr /
tidak merata antar bagian karyawan Unikom disatu sisi ada yang bebannya ringanbr /
di satu sisi cenderung berat. Kondisi ini tentunya harus dicarikan solusinya. Olehbr /
karena itu tujuan penelitian ini untuk mengevaluasi dampak hubungan beban kerjabr /
dan kapasitas kerja terhadap produktivitas kerja baik secara simultan maupunbr /
parsial.br /
Metode penelitian ini menggunakan analisis deskriptif dan verifikatif, yangbr /
di gunakan untuk mengetahui dampak hubungan beban kerja dan kapasitas kerjabr /
terhadap produktivitas kerja karyawan Universitas Komputer Indonesiabr /
(UNIKOM) Bandung. Beban kerja menunjukan kategori berat dan kapasitas kerjabr /
juga berat, kemudian produktivitas kerja menunjukan kriteria baik. populasi yangbr /
diteliti berjumlah 100 responden dan seluruh populsai dijadikan sampel yaitu 100br /
responden maka teknik sampel yang digunakan yaitu teknik sampling jenuh,br /
dengan analisis yang dgunakan adalah analisis jalur, analisis korelasi, analisisbr /
koefisien determinasi simultan dan parsial, dan pengujian hipotesis menggunakanbr /
uji F dan uji t, dengan alat bantu data software SPSS 13.br /
Hasil penelitian menunjukan bahwa, analisis korelasi menunjukan tingkatbr /
keeratan yang kuat, yang berarti semakin baik beban kerja dan kapasitas kerjabr /
yang ditanamkan perusahaan, maka akan meningkatkan produktivitas karyawanbr /
itu sendiri. Besarnya dampak variabel bebas dan terikat secara simultanbr /
dikategorikan baik sebesar 73,3% sedangkan sisanya 26,7% dipengaruhi faktorfaktorbr /
lain. Besarnya dampak secara parsial diketahui sebesar 46,19% ( bebanbr /
kerja terhadap produktivitas kerja ), 27,09% ( kapasitas kerja terhadapbr /
produktivitas kerja). Dan hubungan antara beban kerja dan kapasitas kerjabr /
sebesar 62,2%.
Workload and work capacity is a problem that can not be underestimated,br /
because effect will have a big impact employee productivity Cosmos itself. Therebr /
is a tendency that is not the workload evenly among the employees Unikom onebr /
hand there is a light burden on one side tend to be heavy. This condition wouldbr /
have to find a solution. Therefore, the purpose of this study to evaluate the impactbr /
of relationship workload and work capacity of labor productivity eitherbr /
simultaneously or partial.br /
This research uses descriptive analysis and verifikatif, an d use to determinebr /
the relationship of work load and work capacity impact on employee productivitybr /
Indonesian Computer University (UNIKOM) Bandung. Show the heavy workloadbr /
and workcapacity category is alsoheavy showed a good criterion.The samplebr /
totaled 100 respondents surveyed respondets and the entire population sampledbr /
respondents is 100 samples which used the technique of sampling. with analysisbr /
purpose is pathway analysis, correlation analysis, simultaneous analysis andbr /
partial determination coefficient, and hypothesis testing using the F test and t test,br /
with the tool data software SPSS 13.br /
The results showed that, correlation analysis showed a strong level ofbr /
closeness, which means the better the work load and work capacity investedbr /
enterprise, it will increase employee productivity itself. Magnitude of the impactbr /
of free and bound variables simultaneously categorized both by 73.3% while thebr /
remaining 26.7% influenced other factors. Magnitude impact is partially knownbr /
by 46.19% (workload on work productivity), 27.09% (working capacity of laborbr /
productivity). And the relationship between workload and work capacity bybr /
62.2%.
| Item Type: | Thesis (Other) |
|---|---|
| Additional Information: | Migrasi dari GDL. Identifier: jbptunikompp-gdl-aseplusman-26555. Folder: S1-Final_Project / Fakultas_Ekonomi_Bisnis / Manajemen / 2011 |
| Uncontrolled Keywords: | Beban Kerja, Kapasitas Kerja dan Produktivitas Kerja |
| Divisions: | S1 Skripsi > Manajemen |
| Depositing User: | Robot Migration |
| Date Deposited: | 05 Nov 2026 09:00 |
| Last Modified: | 05 Nov 2026 09:00 |
| URI: | https://elibrary.unikom.ac.id/id/eprint/37799 |
