Sistem Informasi Manajemen Proyek Di CV. Sekar

Reza, Muhamad (2017) Sistem Informasi Manajemen Proyek Di CV. Sekar. Other thesis, Universitas Komputer Indonesia.

[thumbnail of 1. UNIKOM_MUHAMAD REZA_COVER.pdf] Text
1. UNIKOM_MUHAMAD REZA_COVER.pdf

Download (161kB)
[thumbnail of 4. UNIKOM_MUHAMAD REZA_KATA PENGANTAR.pdf] Text
4. UNIKOM_MUHAMAD REZA_KATA PENGANTAR.pdf

Download (396kB)
[thumbnail of 5. UNIKOM_MUHAMAD REZA_DAFTAR ISI.pdf] Text
5. UNIKOM_MUHAMAD REZA_DAFTAR ISI.pdf

Download (344kB)
[thumbnail of 11. UNIKOM_MUHAMAD REZA_DAFTAR PUSTAKA.pdf] Text
11. UNIKOM_MUHAMAD REZA_DAFTAR PUSTAKA.pdf

Download (370kB)
[thumbnail of 12. UNIKOM_MUHAMAD REZA_BAB I.pdf] Text
12. UNIKOM_MUHAMAD REZA_BAB I.pdf

Download (289kB)
[thumbnail of 16. UNIKOM_MUHAMAD REZA_BAB V.pdf] Text
16. UNIKOM_MUHAMAD REZA_BAB V.pdf

Download (147kB)
[thumbnail of 19. UNIKOM_MUHAMAD REZA_LEMBAR PENGESAHAN.pdf] Text
19. UNIKOM_MUHAMAD REZA_LEMBAR PENGESAHAN.pdf

Download (103kB)
[thumbnail of 20. UNIKOM_MUHAMAD REZA_SURAT KETERANGAN TIDAK PLAGIAT.pdf] Text
20. UNIKOM_MUHAMAD REZA_SURAT KETERANGAN TIDAK PLAGIAT.pdf

Download (59kB)
[thumbnail of 21. UNIKOM_MUHAMAD REZA_JURNAL DALAM BAHASA INDONESIA.pdf] Text
21. UNIKOM_MUHAMAD REZA_JURNAL DALAM BAHASA INDONESIA.pdf

Download (961kB)
[thumbnail of 22. UNIKOM_MUHAMAD REZA_JURNAL DALAM BAHASA INGGRIS.pdf] Text
22. UNIKOM_MUHAMAD REZA_JURNAL DALAM BAHASA INGGRIS.pdf

Download (963kB)
[thumbnail of 24. UNIKOM_MUHAMAD REZA_SURAT KETERANGAN PERSETUJUAN PUBLIKASI.pdf] Text
24. UNIKOM_MUHAMAD REZA_SURAT KETERANGAN PERSETUJUAN PUBLIKASI.pdf

Download (120kB)

Abstract

Manajemen proyek yang dikelola oleh CV. SEKAR memiliki beberapa permasalahan, diantaranya pengawasan pelaksanaan proyek tidak sesuai antara jadwal rencana dengan realisasi proyek, munculnya risiko-risiko yang berdampak negatif mengakibatkan terlambatnya penyelesaian proyek dan pembengkakan biaya proyek serta terlambatnya pelaporan kemajuan proyek. Maka diperlukan sistem informasi yang dapat menyelesaikan masalah tersebut. Tujuan yang ingin dicapai dari penelitian ini yaitu mempermudah pengawasan kegiatan pelaksanaan proyek, mengelola biaya untuk penanganan risiko, pengawasan biaya proyek serta mempercepat pelaporan kemajuan proyek. Metode yang digunakan dalam analisis manajemen proyek yaitu metode Precedence Diagraming Method (PDM) untuk penjadwalan proyek, Expected Monetary Value (EMV) untuk menghitung biaya penanganan risiko, serta Earned Value Management (EVM) untuk memudahkan dalam mengukur kinerja proyek. Adapun metodologi pengembangan perangkat lunak yang digunakan yaitu waterfall. Berdasarkan hasil pengujian dengan menggunakan metode blackbox, didapatkan kesimpulan fungsional sistem sudah dapat menghasilkan output yang diharapkan sehingga sistem informasi manajemen proyek yang dibangun sudah memenuhi tujuan yang ingin dicapai.

Maintained by the project management CV. SEKAR has several problems, include the monitoring of the execution of the project does not fit between the schedule of the plan with the realization of the project, the emergence of risks that negatively impact resulted in his late completion of the project and the swelling cost of its projects as well as the late reporting of the progress of the project. Then the necessary information systems that can solve the problem. To achieve the goal of the research is to facilitate the monitoring of the project implementation activities, manage the cost for handling risk, cost control of the project and accelerate the reporting of the progress of the project. Then the necessary information systems that can solve the problem. To achieve the goal of the research is to facilitate the monitoring of the project implementation activities, manage the cost for handling risk, cost control of the project and accelerate the reporting of the progress of the project. The methods used in the analysis of project management method Precedence Diagraming Method (PDM) for scheduling the project, the Expected Monetary Value (EMV) to calculate the cost of handling risks, as well as Earned Value Management (EVM) for ease in measuring the performance of the project. As for the software development methodology used waterfall. Based on the results of testing using blackbox, acquired the system functional conclusions can already produce the expected output so that management information systems projects being built already meets the objectives to be achieved.

Item Type: Thesis (Other)
Additional Information: Migrasi dari GDL. Identifier: jbptunikompp-gdl-muhamadrez-38470. Folder: S1-Final_Project / Fakultas_Teknik_dan_Ilmu_Komputer / Teknik_Informatika / 2017
Uncontrolled Keywords: Sistem Informasi Manajemen Proyek, Earned Value Management, Precedence Diagraming Method, Expected Monetary Value.
Divisions: S1 Skripsi > Teknik Informatika
Depositing User: Robot Migration
Date Deposited: 05 Nov 2026 13:00
Last Modified: 05 Nov 2026 13:00
URI: https://elibrary.unikom.ac.id/id/eprint/49359

Actions (login required)

View Item
View Item