Sugiarti, Santi (2011) Usulan Penentuan Volume Produksi Menggunakan Metode Goal Programming Di PT. Beton Elemenindo Putra. Other thesis, Universitas Komputer Indonesia.
2. Abstract.pdf
Download (10kB)
2.Abstract inggris.pdf
Download (9kB)
4. KATA PENGANTAR.pdf
Download (17kB)
Bab 1.pdf
Download (23kB)
Bab 2 .pdf
Download (1MB)
Bab 3 .pdf
Download (71kB)
Bab 4 .pdf
Download (818kB)
Bab 5.pdf
Download (39kB)
Bab 6.pdf
Download (8kB)
Cover indonesia.pdf
Download (120kB)
DAFTAR PUSTAKA.pdf
Download (7kB)
Abstract
Goal Programming adalah suatu metode yang dapat diterapkan secara efektif dalambr /
perencanaan produksi, karena metode goal programming sangat potensial untukbr /
menyelesaikan aspek-aspek yang bertentangan antara elemen-elemen dalambr /
perencanaan produksi, yaitu konsumen, produk, dan proses manufaktur.br /
PT. Beton Elemenindo Putra merupakan anak perusahaan dari PT. Beton Elemenindobr /
Perkasa, salah satu perusahaan beton prestressed/ precast yang terbesar di Indonesia.br /
Perusahaan ini bergerak dibidang manufaktur yang memproduksi beton styrofoam (BPanel)br /
dan styrofoam (B-Foam). Styrofoam (B-Foam) digunkan untuk memproduksibr /
dan mengembangkan bahan bangunan dan sistem konstruksi baru dan inovatif.br /
Sedangkan b-panel menggunakan panel komposit yang kedap suhu dan suara.br /
Objek penelitian yang dilakukan oleh penulis pada lantai produksi B-foam. Produkbr /
yang dihasilkan B-Foam ada empat jenis yaitu balok, lembaran, pipa dan butiran.br /
Penelitian ini bertujuan mengetahui volume produksi pada produk B-foam yaitu balokbr /
dan pipa karena kedua produk tersebut menguasai 80% volume produksi perusahaan.br /
Untuk menentukan volume produksi perusahaan menggunakan metode tradisionalbr /
tanpa mempertimbangkan maksimal pendapatan penjualan dan minimal biayabr /
produksi. Mengatasi masalah tersebut dilakukan penyempurnaan denganbr /
menggunakan metode goal programming. Untuk menentukan volume penjualan yangbr /
optimal untuk masing item berdasarkan batasan volume produksi seperti waktubr /
proses, bahan baku, dan kapasitas waktu maksimal mesin dalam volumebr /
produksiperusahaan agar dapat memaksimalkan pendapatan penjualan danbr /
meminimalkan biaya produksi.br /
Hasil pengolahan data yang telah dilakukan diperoleh jumlah volume produksibr /
optimal yang harus diproduksi B-foam Balok 580 balok dan B-foam Pipa 33 pipa.br /
Maksimal pendapatan penjualan total contribution untuk B-foam Balok Rpbr /
1,392,000,000/bulan dan B-foam Pipa Rp 1,650,000/bulan. Dan minimal biayabr /
produksi total contribution untuk B-foam Balok Rp 422,855,104/bulan dan B-foambr /
Pipa Rp 13,147,976/bulan.
Goal Programming is a method that can be applied effectively in the planning ofbr /
production, because the goal programming method is the potential to resolve thebr /
conflicting aspects between the elements in the planning of production, namelybr /
consumer, product and manufacturing process.br /
PT. Concrete Elemenindo Putra is a subsidiary of PT. Elemenindo Beton Perkasa,br /
one of the prestressed concrete / precast the largest in Indonesia. The company isbr /
engaged in manufacturing that produces concrete styrofoam (B-Panel) andbr /
Styrofoam (B-Foam). Styrofoam (B-Foam) to use to produce and develop thebr /
building materials and construction of new and innovative systems. While bpanelsbr /
using composite panels and sound-proof temperature.br /
Object of research conducted by the author on the production floor B-foam. Thebr /
resulting product B-Foam, there are four types of blocks, sheets, pipes andbr /
granules. This study aims to find the volume of production in product B-foambr /
beams and pipes that is because both products controlled 80% by volume ofbr /
production companies. To determine the volume of production companies usingbr /
traditional methods without considering the maximum and minimum salesbr /
revenue of production costs. Improvements to resolve the issue using the goalbr /
programming method. To determine the optimal sales volume for each item basedbr /
on the volume of production constraints such as processing time, materials, and abr /
maximum engine capacity in volume produksiperusahaan order to maximize salesbr /
revenues and minimizing production costs.br /
The results of data processing has been done obtained optimal amount ofbr /
production volume is produced by B-Foam Blocks 580 blocks and 33 B-foambr /
pipe tubing. Maximum total sales revenue contribution to B-foam beams Rpbr /
1,392,000,000 /month and B-foam pipe Rp 1,650,000 /month. And a minimumbr /
total production cost contribution for the B-foam beams Rp 422,855,104 /monthbr /
and B-foam pipe Rp 13,147,976 /month.
| Item Type: | Thesis (Other) |
|---|---|
| Additional Information: | Migrasi dari GDL. Identifier: jbptunikompp-gdl-santisugia-26959. Folder: S1-Final_Project / Fakultas_Teknik_dan_Ilmu_Komputer / Teknik_Industri / 2011 |
| Uncontrolled Keywords: | Volume Produksi dan Metode Goal programming. |
| Divisions: | S1 Skripsi > Teknik Industri |
| Depositing User: | Robot Migration |
| Date Deposited: | 05 Nov 2026 09:12 |
| Last Modified: | 05 Nov 2026 09:12 |
| URI: | https://elibrary.unikom.ac.id/id/eprint/38347 |