Penjadwalan Mesin Menggunakan Metode Priority Dispatching Algoritma Jadwal Aktif Dan Jadwal Non Delay N Job Mesin Di UD. Ali Bakri Sukabumi

Somantri, Yudi (2011) Penjadwalan Mesin Menggunakan Metode Priority Dispatching Algoritma Jadwal Aktif Dan Jadwal Non Delay N Job Mesin Di UD. Ali Bakri Sukabumi. Other thesis, Universitas Komputer Indonesia.

[thumbnail of Abstraction.pdf] Text
Abstraction.pdf

Download (7kB)
[thumbnail of Abstrak.pdf] Text
Abstrak.pdf

Download (16kB)
[thumbnail of Cover judul_ING.pdf] Text
Cover judul_ING.pdf

Download (120kB)
[thumbnail of Cover.pdf] Text
Cover.pdf

Download (120kB)
[thumbnail of Daftar Pustaka.pdf] Text
Daftar Pustaka.pdf

Download (13kB)
[thumbnail of Kata Pengantar.pdf] Text
Kata Pengantar.pdf

Download (21kB)
[thumbnail of Bab 1.pdf] Text
Bab 1.pdf

Download (19kB)
[thumbnail of Bab 2.pdf] Text
Bab 2.pdf

Download (207kB)
[thumbnail of Bab 3.pdf] Text
Bab 3.pdf

Download (259kB)
[thumbnail of Bab 4.pdf] Text
Bab 4.pdf

Download (744kB)
[thumbnail of Bab 5.pdf] Text
Bab 5.pdf

Download (17kB)
[thumbnail of Bab 6.pdf] Text
Bab 6.pdf

Download (16kB)

Abstract

UD. ALI BAKRI merupakan salah satu perusahaan makanan kue di Sukabumi.br /

Penjadwalan yang dilakukan oleh UD. ALI BAKRI masih dilakukan secarabr /

konvensional yaitu penjadwalan dilakukan berdasarkan pembuatan produk yangbr /

memiliki jumlah bahan yang paling banyak dan jumlah proses operasi yang palingbr /

banyak di prioritaskan terlebih dahulu.. Sedangkan produk yang memiliki jumlahbr /

komponen dan proses operasinya lebih sedikit diprioritaskan pengerjaannya setelahbr /

produk yang memiliki komponen jumlah komponen dan proses operasi yang palingbr /

banyak.br /

Penjadwalan pada penelitian ini dilakukan dengan dengan menggunakan metodebr /

priority dispatching dengan algoritma jadwal aktif dan jadwal non delay. Pada jadwalbr /

aktif tidak ada operasi yang dapat dilakukan lebih awal tanpa menunda operasi lainnyabr /

atau melanggar technological constrain (memberikan urutan proses pada setiap job ataubr /

dengan kata lain memberikan routing untuk setiap job). Sedangkan jadwal non delaybr /

adalah kumpulan jadwal feasible dimana tidak satupun mesin dibiarkan menganggurbr /

jika pada saat yang sama terdapat operasi yang memerlukan mesin tersebut.br /

Penjadwalan mesin secara yang dilakukan oleh perusahaan memiliki makespan yangbr /

sangat lama sebesar 5124 detik. Sedangkan penjadwalan mesin metode prioritybr /

dispatching dengan algoritma jadwal aktif memiliki makespan lebih pendek sebesarbr /

1890 detik. Dan penjadwalan mesin dengan algoritma jadwal non delay memilikibr /

makespan sama sebesar 2059 detik.br /

Penjadwalan yang terpilih adalah penjadwalan mesin metode priority dispatchingbr /

dengan algoritma jadwal aktif atau jadwal non delay. Karena memiliki makespan palingbr /

pendek penjadwalan algoritma jadwal aktif dan penjadwalan mesin denganbr /

menggunakan algoritma jadwal non delay.

UD. ALI BAKRI represent one of the company of cake food in Sukabumi. Scheduling done bybr /

UD. ALI BAKRI still done conventionally that is scheduling done pursuant to making of productbr /

owning the amount of materials which at most and amount of operation process which at most inbr /

priority beforehand. While product owning the amount of its given high priority by slimmerbr /

operation process and component is its workmanship after product owning component of isbr /

amount of operation process and component which at mostbr /

Scheduling at this research is done with by using method of priority dispatching with activebr /

schedule algorithm and schedule of[is non delay. At active schedule there no operation able to bebr /

done earlier without delaying other operation or impinge constrain technological ( givingbr /

sequence process in each job or equally give routing to each;every job). While schedule of is nonbr /

delay is schedule corps of feasible where do not machine one even let out of job if at the (time)br /

of is same there are operation needing the machinebr /

Scheduling of machine done by company have very old makespan equal to 5124 second. Whilebr /

scheduling of method machine of priority dispatching with active schedule algorithm havebr /

shorter makespan equal to 1890 second. And scheduling of machine with schedule algorithm ofbr /

is non delay have is same makespan equal to 2059 second.br /

Chosen scheduling is scheduling of method machine of priority dispatching with active schedulebr /

algorithm or schedule of is non delay. Because owning shortest makespan of scheduling of activebr /

schedule algorithm and scheduling of machine by using schedule algorithm of is non delay

Item Type: Thesis (Other)
Additional Information: Migrasi dari GDL. Identifier: jbptunikompp-gdl-yudisomant-26562. Folder: S1-Final_Project / Fakultas_Teknik_dan_Ilmu_Komputer / Teknik_Industri / 2011
Uncontrolled Keywords: penjadwalan, jadwal aktif, jadwal non delay.
Divisions: S1 Skripsi > Teknik Industri
Depositing User: Robot Migration
Date Deposited: 05 Nov 2026 09:01
Last Modified: 05 Nov 2026 09:01
URI: https://elibrary.unikom.ac.id/id/eprint/37810