Kurniawan, Bobi (2009) Modul Praktikum Hardware. Universitas Komputer Indonesia.
COVER MODUL PRAKTIKUM PERANGKAT KERAS UNIKOM.rtf
Download (3kB)
LEMBAR KERJA SISWA PAKTIKUM PERANGKAT KERAS KERAS UNIKOM.rtf
Download (1MB)
PRAKTIKUM VI TROUBLESHOOTING.rtf
Download (124kB)
PRATIKUM I MERAKIT KOMPUTER.rtf
Download (106kB)
PRATIKUM II SETUP BIOS.rtf
Download (122kB)
PRATIKUM III PARTISI HARDDISK.rtf
Download (148kB)
PRATIKUM IV INSTALASI.rtf
Download (94kB)
Silabus.rtf
Download (80kB)
PRAKTIKUM V INSTALASI KABEL UTP.rtf
Download (3MB)
Abstract
Modul Praktikum Hardware
| Item Type: | Other |
|---|---|
| Additional Information: | Migrasi dari GDL. Identifier: jbptunikompp-gdl-bobikurnia-23662. Folder: Materi_Kuliah / PROGRAM STUDY / Teknik Arsitektur / Genap 2009-2010 |
| Uncontrolled Keywords: | Materi Kuliah Modul Praktikum Hardware, Teknik Arsitektur |
| Divisions: | ?? Materi_Kuliah_GDL ?? |
| Depositing User: | Robot Migration |
| Date Deposited: | 05 Nov 2026 07:54 |
| Last Modified: | 05 Nov 2026 07:54 |
| URI: | https://elibrary.unikom.ac.id/id/eprint/34858 |
