New Pipeline Tie-Ins Shutdown

Thomson, George Falconer and Brian (1988) New Pipeline Tie-Ins Shutdown. Universitas Komputer Indonesia.

Full text not available from this repository.

Abstract

The feasibility of marginal field development may be enhanced by proximation to existing facilities. In current field expansion, it is typical to share existing process facilities although additional process or treatment equipment may be necessary.

Item Type: Book
Additional Information: Migrasi dari GDL. Identifier: jkpkelnusa-gdl-book-1988-george-2417-oil. Folder: Collections / Koleksi_Perpustakaan_di_Indonesia / Perpustakaan di Indonesia / JKPKELNUSA / Terbitan_Internal / Seminar
Uncontrolled Keywords: Oil,gas,new,pipeline
Divisions: ?? Koleksi_Luar_GDL ??
Depositing User: Robot Migration
Date Deposited: 05 Nov 2026 04:29
Last Modified: 05 Nov 2026 04:29
URI: https://elibrary.unikom.ac.id/id/eprint/20023

Actions (login required)

View Item
View Item