LOBP Process Design Package. Updated per Review Meeting

Elnusa, BP Indonesia and (1997) LOBP Process Design Package. Updated per Review Meeting. Universitas Komputer Indonesia.

Full text not available from this repository.

Abstract

Table of Contents :
LOBP design basis.
LOBP design basis report.
LOBP porcess description.
Raw material properties and operating conditions.
Hydraulic summaries.
LOBP tank weights.
Project domentation summary.
Equipment list.
Instrument list.
Process and utility line list.
Motor list.
Steam requirements.
Piggable piping specification.
Equipment specifications.

Item Type: Book
Additional Information: Migrasi dari GDL. Identifier: jkpkelnusa-gdl-grey-1997-bp-1897-lobp. Folder: Collections / Koleksi_Perpustakaan_di_Indonesia / Perpustakaan di Indonesia / JKPKELNUSA / Terbitan_Internal / Data2_-_Dokumentasi / PT._Elnusa_Tbk
Uncontrolled Keywords: LOBP,BSD
Divisions: ?? Koleksi_Luar_GDL ??
Depositing User: Robot Migration
Date Deposited: 05 Nov 2026 04:28
Last Modified: 05 Nov 2026 04:28
URI: https://elibrary.unikom.ac.id/id/eprint/19872

Actions (login required)

View Item
View Item