Meinawati (2015) Sistem Pengendalian Persediaan Bahan Baku produksi Menggunakan pendekatan Material Requirement Planning Di CV. Prima Trekking. Other thesis, Universitas Komputer Indonesia.
UNIKOM_MEINAWATI_BAB 1.pdf
Download (108kB)
UNIKOM_MEINAWATI_BAB 2.pdf
Download (505kB)
UNIKOM_MEINAWATI_BAB 3.pdf
Download (3MB)
UNIKOM_MEINAWATI_BAB 4.pdf
Download (322kB)
UNIKOM_MEINAWATI_BAB 5.pdf
Download (8kB)
UNIKOM_MEINAWATI_COVER.pdf
Download (42kB)
UNIKOM_MEINAWATI_DAFTAR ISI.pdf
Download (101kB)
UNIKOM_MEINAWATI_DAFTAR PUSTAKA.pdf
Download (56kB)
UNIKOM_MEINAWATI_LEMBAR PENGESAHAN.pdf
Download (200kB)
UNIKOM_MEINAWATI_SURAT HAK EKSKLUSIF.pdf
Download (174kB)
UNIKOM_MEINAWATI_SURAT KETERANGAN TIDAK PLAGIAT.pdf
Download (181kB)
Abstract
CV. Prima Trekking adalah suatu badan usaha yang bergerak dibidang manufaktur dan retail peralatan petualangan alam terbuka. Dimana kegiatan proses produksinya yakni mengolah bahan baku menjadi barang jadi sesuai pesanan yang diinginkan oleh pelanggan. Kegiatan proses produksi tersebut dikendalikan oleh seorang kepala produksi. Permasalahan yang terjadi di CV. Prima Trekking adalah pada perencanaan pengendalian persediaan bahan baku, yaitu kurang tepatnya perhitungan untuk persediaan bahan baku dapat mengakibatkan kekurangan dan kelebihan bahan baku. Hal ini juga dapat mengakibatkan terjadinya keterlambatan dalam proses produksi dikarenakan kurangnya jumlah bahan baku yang tersedia. Sistem pengendalian bahan baku menggunakan pendekatan Material Requirement Planning (MRP) menjadi pilihan yang tepat untuk menangani permasalahan tersebut dikarenakan bahan baku didapatkan dari supplier. Sistem pengendalian persediaan bahan baku tersebut dibangun bertujuan untuk menampilkan informasi mengenai perencanaan pemesanan bahan baku dan penjadwalan proses produksi, sehingga dapat mengatasi kekurangan ataupun kelebihan persediaan bahan baku. Berdasarkan hasil pengujian yang terdiri dari pengujian black box dan beta, dapat disimpulkan bahwa sistem informasi yang dibangun dapat membantu kepala produksi untuk mengatasi kekurangan ataupun kelebihan persediaan bahan baku dengan perhitungan perencanaan pemesanan bahan baku menggunakan metode Economic Order Quantity (EOQ) selain itu juga dapat mengatasi keterlambatan proses produksi dengan dibuatnya penjadwalan proses produksi menggunakan Master Production Schedule, sehingga tidak terlambat dalam memenuhi permintaan pesanan dari pelanggan.
CV. Prima Trekking is a business entity that is engaged in the manufacturing and retail outdoor adventure equipment. Where the activities of the production process to process raw materials into finished goods to order desired by the customer. Activities of the production process is controlled by a head of production. Problems that occur in the CV. Prima Trekking is on the planning of material supply, which is less precise calculations for the supply of raw materials could lead to shortage and excess raw materials. It can also lead to delays in the production process due to the lack of raw materials available.Raw material control system using the approach of Material Requirement Planning (MRP) be the right choice for dealing with these problems due to raw material obtained from suppliers. Raw material inventory control system is constructed aiming to display information about the planning and scheduling of raw materials ordering the production process, so as to overcome the shortage or excess inventory of raw materials. Based on test results which consist of black box testing and beta, it can be concluded that the information system built to help the head of production to address the shortage or excess inventory of raw material with raw material ordering planning calculations using Economic Order Quantity (EOQ) but it also can be overcome delays in the production process with the establishment of scheduling the production process using the Master production Schedule, so it is not too late to meet the demand of customer orders.
| Item Type: | Thesis (Other) |
|---|---|
| Additional Information: | Migrasi dari GDL. Identifier: jbptunikompp-gdl-meinawatin-34053. Folder: S1-Final_Project / Fakultas_Teknik_dan_Ilmu_Komputer / Teknik_Informatika / 2015 |
| Uncontrolled Keywords: | Sistem Pengendalian, Material Requirement Planning, Economic Order Quantity |
| Divisions: | S1 Skripsi > Teknik Informatika |
| Depositing User: | Robot Migration |
| Date Deposited: | 05 Nov 2026 04:24 |
| Last Modified: | 05 Nov 2026 04:24 |
| URI: | https://elibrary.unikom.ac.id/id/eprint/19658 |